Puppet Theater Designer: MOS (Hilary Sample and Michael Meredith)
Location: Cambridge, MA
To celebrate the 40th anniversary of Le Corbusier's Carpenter Center, his only North American project, this theater was constructed within the sunken exterior courtyard for a puppet performance by the conceptual artist Pierre Huyghe. The organic form of the theater was built with 500 unique white polycarbonate panels diamond shaped interlock to become a rigid structure and are simply bolted together, in order to be easily assembled and disassembled. mos-office.net Posted: 07/02/2009 digg | del.icio.us | stumble | email this

Go to: Previous Page | SpaceInvading Front Page